

.png)
.png)
1.78MW PCS & 7.14MWh batteries in a 20ft cabinet
Pre-installation and pre-commissioning, 1GWh plant self-configuration & self-check in 1h
1 PCS for 1 Rack, eliminating barrel effects; Multi-level SOC balancing from cell to power plant
0°C temperature rise around equipment, mitigating the heat island effect with 9% power savings
1 strategy for 1 cabinet, dynamically control for 1°C change, 10% power savings
30+ fault early warning, ≥99% localization accuracy in root cause & full-plant health report ready in 10 minutes
Industry-first in-cluster fuse protection keeps faults within the cluster; ArcDefender® 2.0 delivers 100% accurate arc protection
Stable across 1~100 SCR, μs-level voltage establishment, <5%Un transient overvoltage suppression, GW-scale black start

